- Incremental Method Projects
Action Formwork Solutions
The formwork suits to cast a 125m long curved bridge with a 1370m radius.
The incremental launching method of bridge construction is employed mainly for the construction of continuous concrete bridges. With this method of construction, the bridge deck is built in sections by pushing the structure outwards from an abutment towards the piers.
Solution by our partner in Belgium, Construx.
Specifications:
- Hyperstatic box girder bridge
- Top Width 9.8m inside
- Bottom width 5.0m inside
- 5 match cast segments of 25m each
- No ties through the concrete
- Casting yard with 30m long concrete means
- Teflon sliding plates
- Stainless steel contact plate
- Full steel curved table form 5 sections of 5.5m long




Concrete Confidence Delivered
Action Formwork delivers reliable solutions that support safe, efficient, and successful construction projects. From expert formwork design and dependable transport to professional cleaning, repair, and flexible finance options, we help builders achieve outstanding results with quality service and trusted industry expertise.