The formwork suits to cast a 125m long curved bridge with a 1370m radius.
The incremental launching method of bridge construction is employed mainly for the construction of continuous concrete bridges. With this method of construction, the bridge deck is built in sections by pushing the structure outwards from an abutment towards the piers.
Solution by our partner in Belgium, Construx.
Specifications:
- Hyperstatic box girder bridge
- Top Width 9.8m inside
- Bottom width 5.0m inside
- 5 match cast segments of 25m each
- No ties through the concrete
- Casting yard with 30m long concrete means
- Teflon sliding plates
- Stainless steel contact plate
- Full steel curved table form 5 sections of 5.5m long




Concrete Confidence Delivered
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but the leap into electronic unchanged.